In EHS, we understand the need to deliver cost effective quality work in support to our clients’ needs and requirements. Our past experiences in the various environmental fields are a stamp of our effort to provide as such.
Environmental Impact Assessment (EIA) & Environmental Management Plan (EMP)
Some experiences by our individuals in EIA and EMP include:
EIA and EMP for scheduled waste facility in Negeri Sembilan
EIA for campus development at East Peninsular Malaysia
EIA for various industries in Malaysia
EIA for an infrastructure project in Johor Bahru, Johor
EMP for a proposed mixed development at Klang, Selangor
EMP for a proposed Office development at Kuala Lumpur
EMP for a proposed infrastructure development for an airport facility in Selangor
For EIA projects, our consultants carry out the study with a team of registered consultants and the study is tailor suited to each individual project with an objective to identify and evaluate environmental impacts that may arise and recommend mitigation/control measures to maintain impacts to within acceptable levels.
For EMP projects, our consultant prepares a concise report in the format of a plan to enable practical implementation for environmental management practices at the project site throughout the whole duration of a development.
Environmental Monitoring and Audit (EMA)
Some experiences by our individuals in EMA include:
EMA for farming facility at Kuala Berang, Terengganu
EMA for a campus development at Kuala Lumpur
EMA for a government facility at Klang, Selangor
EMA for national infrastructure (highway) development projects in Perak and Johor
EMA for national infrastructure (centralised sewerage treatment plant) development projects in Penang.
EMA for a residential development in Negeri Sembilan
For EMA projects, our consultant monitors and ensure that the project development are conducted according to the proposed EMP report to ensure that the project activities has minimal impact on the environment and its surrounding as identified in earlier studies.
Environmental Monitoring
Our consultants are well experienced in carrying out Environmental Monitoring projects. The environmental monitoring projects are carried out for a variety of clients ranging from industrial factories to development companies to government agencies. The scope of work completed for monitoring and sampling of various environmental components namely:
Environmental Site Assessment (ESA)
Some experiences by our individuals in ESA include:
Soil and Groundwater Assessment for a Contaminated Site at an Industrial Facility in East Peninsular Malaysia
ESA, Phase 2 for a petrochemical company at East Malaysia
ESA, Phase 1 and Phase 2 for a petrochemical company facility in Klang valley
ESA, for industrial facilities in Klang valley
Soil and Groundwater Assessment for an Industrial Facility in Klang valley
Groundwater Monitoring at several petrochemical companies in Klang valley
In ESA projects, the main objective is to delineate and assess the extent of any onsite and offsite soil and groundwater contamination and physical environmental condition of a site.
Our consultants carry out the projects from the initial site survey, desktop review, site sampling and monitoring work, data assessment, report writing, all the way until report presentation. We work closely with client and monitor our sub-contractors to ensure that the work is conducted in accordance to acceptable industrial standard and practices.
Environmental Compliance Audit
Our auditors are recognized by DOE under its stringent registration scheme and some of our experiences for environmental compliance audit include:
Environmental Compliance Audit for Quarry in Selangor
Environmental Compliance Audit for Cement Plant in Perak
Environmental Compliance Audit for Cooling Facilities in Central Region, Malaysia
Environmental Compliance Audit for Petrochemical Facilities in Pahang
Environmental Compliance Audit for Scheduled Waste Facilities in Selangor, Penang and Johor.
In environmental compliance audit projects, the main objective are to review and audit the status of regulatory compliance of the facilities operations in terms of EIA Approval Conditions and also key legal requirements on environmental. The audit also identifies areas of improvement or recommendations for follow-up corrective actions.